cpnybjtp

Products

professional factory for Mach4 Controller - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Bear Customer initially, High quality first in mind, we do the job closely with our customers and supply them with efficient and skilled providers for Remote Control Robot Arm, Bldc Servo Driver, Numerical Control Milling Machine, We glance forward to giving you with our solutions while in the in the vicinity of future, and you will come across our quotation may be very affordable and the high quality of our merchandise is extremely outstanding!
professional factory for Mach4 Controller - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker Detail:

Product Parameters

Application: Lathe and Turning Center, CNC Boring Machine, CNC wood working machine, CNC Milling machinery, CNC drilling machinery, and especially automatic equipment

Axis: 1-10axis

Machinery Test Report: Provided.

Function: Support ATC, Macro function, and PLC displayer

Core Components: PLC, CNC, Macro program, CNC controller.

CPU: ARM(32bits)+DSP+FPGA.

Port: 56input 32output

Weight: 8KG

User Store Room: 128Mb

Interface:USB+RS232 Communction Port.

Supply Ability:10000 Set/Sets per Month.

Warranty:2 Years

product-description1

Parameter details(G code shows)

1. Locate rapidly: G00
2. Straight line interpolation: G01
3. Arc interpolation: G02/03
4. Cycle of cutting cyliner or cone: G90
5. Cycle of cutting end face: G94
6. cycle of cutting thread: G92
7. Fixed cycle of tapping: G93
8. Cycle of rough cut in excircle: G71
9. Cycle of rough cut at end face: G72
10. Cycle of closed cut: G73
11. Cycle of drill deep hole at end face: G74
12. Cycle of cutting groove with external diameter: G75
13. Cycle of cutting compound thread: G76
14. Cycle of program: G22,G800
15. Local coordinate system: G52

16. Detect the instruction of skip: G31,G311
17. Pole coordinate: G15, G16
18. Metrical/Imperial programme: G20,G21
19. Set coordinate, offset: G184,G185
20. Workpiece coordinate system: G54~G59
21. Tool radius C: G40, G41, G42
22. Accurate locating/continuous path process: G60/G64
23. Feeding mode: G98,G99
24. Backing to start point of program: G26
25. Backing to the fixed point: G25, G61, G60
26. Backing to the datum point: G28
27. Suspend: G04
28. Macro Program: G65, G66, G67
29. Auxiliary function: S, M, T

Customer Praise

Customer praise  (1)
Customer praise  (13)
Customer praise  (14)
Customer praise  (16)
Customer praise  (17)
Customer praise  (15)

Customer Case

Customer praise  (18)
Customer praise  (23)
Customer praise  (19)
Customer praise  (20)
Customer praise  (21)
product-description1
Customer praise  (22)


Product detail pictures:

professional factory for Mach4 Controller - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker detail pictures

professional factory for Mach4 Controller - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker detail pictures

professional factory for Mach4 Controller - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker detail pictures

professional factory for Mach4 Controller - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker detail pictures


Related Product Guide:

We not only will try our great to supply outstanding services to every shopper, but also are ready to receive any suggestion offered by our buyers for professional factory for Mach4 Controller - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker , The product will supply to all over the world, such as: Lithuania, Brasilia, Philippines, With the development of the society and economy, our company will continue the loyalty, dedication, efficiency, innovation spirit of enterprise, and we will always adhere to the management idea of would rather lose gold, do not lose customers heart. We will serve the domestic and foreign businessmen with sincere dedication, and let us create bright future together with you!
  • We have been cooperated with this company for many years, the company always ensure timely delivery ,good quality and correct number, we are good partners.
    5 Stars By Evangeline from Cyprus - 2018.11.11 19:52
    The enterprise has a strong capital and competitive power, product is sufficient, reliable, so we have no worries on cooperating with them.
    5 Stars By Anne from Norwegian - 2018.06.09 12:42
    Write your message here and send it to us