cpnybjtp

Products

Factory Supply Plc Cnc Controller - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our mission is usually to turn into an innovative provider of high-tech digital and communication devices by furnishing benefit added design and style, professional manufacturing, and service capabilities for Hulk Robot Arm, Robot Motion Control, Cnc Controller Router, We usually concertrating on acquiring new creative products to fulfill request from our clientele all around the world. Be a part of us and let's make driving safer and funnier jointly!
Factory Supply Plc Cnc Controller - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker Detail:

Product Parameters

Application: Lathe and Turning Center, CNC Boring Machine, CNC wood working machine, CNC Milling machinery, CNC drilling machinery, and especially automatic equipment

Axis: 1-10axis

Machinery Test Report: Provided.

Function: Support ATC, Macro function, and PLC displayer

Core Components: PLC, CNC, Macro program, CNC controller.

CPU: ARM(32bits)+DSP+FPGA.

Port: 56input 32output

Weight: 8KG

User Store Room: 128Mb

Interface:USB+RS232 Communction Port.

Supply Ability:10000 Set/Sets per Month.

Warranty:2 Years

product-description1

Parameter details(G code shows)

1. Locate rapidly: G00
2. Straight line interpolation: G01
3. Arc interpolation: G02/03
4. Cycle of cutting cyliner or cone: G90
5. Cycle of cutting end face: G94
6. cycle of cutting thread: G92
7. Fixed cycle of tapping: G93
8. Cycle of rough cut in excircle: G71
9. Cycle of rough cut at end face: G72
10. Cycle of closed cut: G73
11. Cycle of drill deep hole at end face: G74
12. Cycle of cutting groove with external diameter: G75
13. Cycle of cutting compound thread: G76
14. Cycle of program: G22,G800
15. Local coordinate system: G52

16. Detect the instruction of skip: G31,G311
17. Pole coordinate: G15, G16
18. Metrical/Imperial programme: G20,G21
19. Set coordinate, offset: G184,G185
20. Workpiece coordinate system: G54~G59
21. Tool radius C: G40, G41, G42
22. Accurate locating/continuous path process: G60/G64
23. Feeding mode: G98,G99
24. Backing to start point of program: G26
25. Backing to the fixed point: G25, G61, G60
26. Backing to the datum point: G28
27. Suspend: G04
28. Macro Program: G65, G66, G67
29. Auxiliary function: S, M, T

Customer Praise

Customer praise  (1)
Customer praise  (13)
Customer praise  (14)
Customer praise  (16)
Customer praise  (17)
Customer praise  (15)

Customer Case

Customer praise  (18)
Customer praise  (23)
Customer praise  (19)
Customer praise  (20)
Customer praise  (21)
product-description1
Customer praise  (22)


Product detail pictures:

Factory Supply Plc Cnc Controller - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker detail pictures

Factory Supply Plc Cnc Controller - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker detail pictures

Factory Supply Plc Cnc Controller - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker detail pictures

Factory Supply Plc Cnc Controller - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker detail pictures


Related Product Guide:

We have state-of-the-art equipment. Our products are exported for the USA, the UK and so on, enjoying a fantastic status among the clients for Factory Supply Plc Cnc Controller - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker , The product will supply to all over the world, such as: Jamaica, Netherlands, Portland, By integrating manufacturing with foreign trade sectors, we can offer total customer solutions by guaranteeing the delivery of right items to the right place at the right time, which is supported by our abundant experiences, powerful production capability, consistent quality, diversified product portfolios and the control of the industry trend as well as our mature before and after sales services. We'd like to share our ideas with you and welcome your comments and questions.
  • The sales manager is very patient, we communicated about three days before we decided to cooperate, finally, we are very satisfied with this cooperation!
    5 Stars By EliecerJimenez from Croatia - 2018.02.12 14:52
    We have been looking for a professional and responsible supplier, and now we find it.
    5 Stars By Octavia from Greenland - 2017.08.16 13:39
    Write your message here and send it to us