cpnybjtp

Products

Factory Price For Cnc Controller Offline - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our development depends on the advanced equipment ,excellent talents and continuously strengthened technology forces for Vertical Articulated Robot, Ac Motor Controller, Small Remote Control Robot, We welcome you to definitely inquire us by simply call or mail and hope to develop a prosperous and cooperative connection.
Factory Price For Cnc Controller Offline - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker Detail:

Product Parameters

Application: Lathe and Turning Center, CNC Boring Machine, CNC wood working machine, CNC Milling machinery, CNC drilling machinery, and especially automatic equipment

Axis: 1-10axis

Machinery Test Report: Provided.

Function: Support ATC, Macro function, and PLC displayer

Core Components: PLC, CNC, Macro program, CNC controller.

CPU: ARM(32bits)+DSP+FPGA.

Port: 56input 32output

Weight: 8KG

User Store Room: 128Mb

Interface:USB+RS232 Communction Port.

Supply Ability:10000 Set/Sets per Month.

Warranty:2 Years

product-description1

Parameter details(G code shows)

1. Locate rapidly: G00
2. Straight line interpolation: G01
3. Arc interpolation: G02/03
4. Cycle of cutting cyliner or cone: G90
5. Cycle of cutting end face: G94
6. cycle of cutting thread: G92
7. Fixed cycle of tapping: G93
8. Cycle of rough cut in excircle: G71
9. Cycle of rough cut at end face: G72
10. Cycle of closed cut: G73
11. Cycle of drill deep hole at end face: G74
12. Cycle of cutting groove with external diameter: G75
13. Cycle of cutting compound thread: G76
14. Cycle of program: G22,G800
15. Local coordinate system: G52

16. Detect the instruction of skip: G31,G311
17. Pole coordinate: G15, G16
18. Metrical/Imperial programme: G20,G21
19. Set coordinate, offset: G184,G185
20. Workpiece coordinate system: G54~G59
21. Tool radius C: G40, G41, G42
22. Accurate locating/continuous path process: G60/G64
23. Feeding mode: G98,G99
24. Backing to start point of program: G26
25. Backing to the fixed point: G25, G61, G60
26. Backing to the datum point: G28
27. Suspend: G04
28. Macro Program: G65, G66, G67
29. Auxiliary function: S, M, T

Customer Praise

Customer praise  (1)
Customer praise  (13)
Customer praise  (14)
Customer praise  (16)
Customer praise  (17)
Customer praise  (15)

Customer Case

Customer praise  (18)
Customer praise  (23)
Customer praise  (19)
Customer praise  (20)
Customer praise  (21)
product-description1
Customer praise  (22)


Product detail pictures:

Factory Price For Cnc Controller Offline - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker detail pictures

Factory Price For Cnc Controller Offline - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker detail pictures

Factory Price For Cnc Controller Offline - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker detail pictures

Factory Price For Cnc Controller Offline - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker detail pictures


Related Product Guide:

Our concentrate on should be to consolidate and enhance the quality and service of present products, meanwhile consistently produce new products to meet unique customers' demands for Factory Price For Cnc Controller Offline - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker , The product will supply to all over the world, such as: Australia, Nigeria, Zurich, We have advanced production technology, and pursuit innovative in products. At the same time, the good service has enhanced the good reputation. We believe that as long as you understand our product, you must be willing to become partners with us. Looking forward to your inquiry.
  • Hope that the company could stick to the enterprise spirit of Quality, Efficiency, Innovation and Integrity, it will be better and better in the future.
    5 Stars By Lauren from Puerto Rico - 2018.06.18 17:25
    The company can think what our think, the urgency of urgency to act in the interests of our position, can be said this is a responsible company, we had a happy cooperation!
    5 Stars By Laura from Kenya - 2017.09.22 11:32
    Write your message here and send it to us